Waste Incineration Power Generation Project (Fly Ash Landfill) Impermeable Membrane Construction Project in Changting County, Fujian Province

2025/04/22 10:12

This project is a double-layer anti-seepage structure for hazardous waste landfill, with a single-layer area of about 24,000 square meters. The terrain is extremely irregular, with large slopes and a very small reservoir bottom of only about 3,000 square meters.

 

Impermeable Membrane Construction Project.png


Impermeable Membrane Construction Project.png